📐 Formula & Method
Loose Volume = Bank Volume × Swell Factor. Trucks = Loose Volume / Truck Capacity.
Trucks = (Volume × SwellFactor) / Capacity
📋 Worked Example
100 m³ excavation, 6 m³ truck, 1.25 swell: • Loose Volume = 125 m³ • Trucks = 125 / 6 ≈ 21 nos