📐 Formula & Method

External plaster is thicker (20mm) and requires more material per unit area.

Volume = Area × Thickness × 1.33

📋 Worked Example

100 m² wall, 20mm thick (1:4 ratio):
• Volume = 2 m³ wet → 2.66 m³ dry
• Cement ≈ 15 bags