Expert Guide
Babu
Planning & Costing

Construction Water Usage Estimator

Quality Inspector
Kaka

Find daily water required on site.

📐 Formula & Method

Mixing/Curing: 150-200 L/m³. Labor: 45 L/person/day.

Water = (Work × 200) + (Labor × 45)

📋 Worked Example

10m³ brickwork, 5m³ concrete, 20 labor:
• Work Water = 15 × 200 = 3000L
• Labor Water = 20 × 45 = 900L
• Total = 3900 Liters

❓ Frequently Asked Questions

Yes, water used for mixing concrete and mortar should be clean and within permissible pH/mineral limits to avoid strength loss and corrosion.

Professional House Estimation

Get a complete, itemized cost breakdown and material list for your entire project with Nirmansutra Pro.

Visit Pro 🚀