📐 Formula & Method

Average duration is about 6 months for first 1000 sq.ft + 1 month per additional floor/500sq.ft.

Duration = BaseTime + FloorAdjustment

📋 Worked Example

1500 sq.ft single floor:
• Base = 6 months
• Addition = 1 month
• Total ≈ 7 months

❓ Frequently Asked Questions

Weather (monsoons), labor shortage, material unavailability, and design changes during construction are the most common causes of delay.