Find timeline for your house project.
📐 Formula & Method
Average duration is about 6 months for first 1000 sq.ft + 1 month per additional floor/500sq.ft.
Duration = BaseTime + FloorAdjustment
📋 Worked Example
1500 sq.ft single floor: • Base = 6 months • Addition = 1 month • Total ≈ 7 months
❓ Frequently Asked Questions
Weather (monsoons), labor shortage, material unavailability, and design changes during construction are the most common causes of delay.