Construction Logistics & Truck Load Calculator (Nepal)

Expert Guide
Babu

Calculate exactly how many concrete mixer trucks are needed for your project volume.

🛠️ How It Works

Divide total volume by truck capacity. The remainder is sent in the last load.

📐 Calculation Formula

Trucks = Total Volume / Truck Size

📋 Real-Life Example

For 15 m³ using 6 m³ trucks:
• 15 / 6 = 2.5 loads (2 full loads and 1 partial load of 3 m³)

❓ Frequently Asked Questions

Most RMC suppliers charge a "short load" fee if the truck is not full. Try to plan your pour volume in multiples of truck capacity if possible.
For standard RCC structures using OPC cement, continuous curing is required for at least 7 to 10 days. If using PPC or Fly-ash blended cement, a minimum of 14 days is recommended to ensure full structural strength and prevent shrinkage cracks.

Stop Guessing. Start Building.

  • Square Feetको भ्रममा नफस्नुहोस्।(Don't get trapped in Square Feet rate illusions.)
  • Save up to 11% on materials with an accurate BOQ.
  • 🎯Worth NRs. 5000, Now for NRs. 999 only!
Get My Estimate Now 🚀